Hoshizaki AM-50BAE-AD Ice Maker User Manual


 
25
G. Final Checklist
WARNING
CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are
securely in place after installation. Make sure that none have fallen into the
storage bin.
1) Is the icemaker level?
2) Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to
38°C) and the water temperature within 45°F to 95°F (7°C to 35°C) all year around?
3) Have the shipping carton, tape, and packing material been removed from the icemaker?
4) Have all electrical and water connections been made? Do electrical and water
connections meet all national, state, and local code and regulation requirements?
5) Has the power supply voltage been checked or tested against the nameplate rating? Is
the power supply a properly grounded, independent 3-prong wall outlet?
6) Are the water supply line shut-off valve and drain valve installed? Has the water supply
pressure been checked to ensure a minimum of 10 PSIG and a maximum of 113 PSIG?
7) Are all components, fasteners, and thumbscrews securely in place?
8) Has the end user been given this instruction manual, and instructed on how to operate
the icemaker and the importance of the recommended periodic maintenance?
9) Has the end user been given the name and telephone number of an authorized service
agent?
10) Has the warranty tag been lled out and forwarded to the factory for warranty
registration?