Hoshizaki KM-260BAH Ice Maker User Manual


 
51
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 275°F (135°
C).
8) Install the new drier (see “4. DRIER”).
9) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (see “1. [c] EVACUATION AND
RECHARGE”).
11) Attach the solenoid coil to the valve body, and secure it with the screw.
12) Connect the lead wires.
13) Re t the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Fig. 4
Hot Gas Valve