2. "G" Control Board with Harvest Pump Timer Operation
1 to 3-min. harvest timer in
control (S4 dip switch 1 & 2)
• Maximum inlet water valve time: 6 min. or the length of
harvest minus 50 sec. (S4 dip switch 7), whichever is shorter.
• Maximum harvest time: 20 min.
FS check
Legend:
Comp–compressor
FM–fan motor
FMR–fan motor-remote
FS–oat switch
HGV–hot gas valve
LLV–liquid line valve
MBC–mechanical bin control
PM–pump motor
WV–inlet water valve
Components Energized when the Control Switch is in the "WASH" Position
The "WASH" position on the control switch is used when cleaning and sanitizing the icemaker. When in the "WASH" position, power is
supplied to the pump motor. With the cleaning valve closed, the cleaner and sanitizer ow over the outside of the evaporator plate assembly.
With the cleaning valve open, the cleaner and sanitizer ow over both the outside and the inside of the evaporator plate assembly.
Note: Close the cleaning valve after cleaning and sanitizing are complete, otherwise the icemaker will not restart when the control switch is
placed in the "ICE" position.
"G" Control Board With Harvest Pump Timer Operation Sequence Flow Chart
1. 1-Minute
Fill Cycle
Cycle
Steps
2. Harvest Cycle
Thermistor in
control
3. Freeze Cycle
• Minimum freeze time: 5 min.
• Maximum freeze time: freeze timer
setting (S4 dip switch 9 & 10)
FS in control
4. Pump-Out Cycle
• Factory set for every
10th cycle
(except KM-515M_H)
(S4 dip switch 5 & 6)
• Pump motor stops for
2 sec., then reverses
for 10/20 sec.
(S4 dip switch 3 & 4)
WV energized
FS open
Comp energized
FMR energized
HGV energized
WV energized
Thermistor temperature reaches
48°F (9°C) (3.9 kΩ or less). Harvest
timer starts (1 to 3 min.).
FS open
Comp continues
FMR continues
FM energized
LLV energized
PM energized
HGV de-energized
FS closed
Comp continues
FMR continues
HGV energized
PM de-energizes for 2 sec.,
then reverses for 10/20 sec.
FM de-energized
LLV de-energized
FS check
Startup
If FS is open, Comp stops and cycle returns to 1-min. ll.
1. Bin Full
Shutdown Delay:
Fill Cycle–15 sec. after activation.
Harvest Cycle–At the end of the harvest cycle, or up to 15 sec. into the
freeze cycle if activated at the end of the harvest cycle.
Freeze Cycle–15 sec. after activation if activated at least 15 sec. before
the 5-min. short cycle protection timer terminates.
Otherwise, at the end of the next harvest cycle.
Shutdown
and Restart
MBC Operation
MBC open (MBC actuator paddle engaged)
Green "BC CLOSED" LED off
Yellow "BC OPEN" LED on
Yellow "BC OPEN" LED continues. All
components de-energized.
5-min. minimum
freeze timer in
control
FS closed
FS opens or
freeze timer
terminates
2. Icemaker Off
All components
de-energized.
3. Ice Level Lowered
Icemaker starts at
"1. 1-Minute Fill Cycle."
To 1 above
MBC closed
(MBC actuator paddle disengaged)
Green "BC CLOSED" LED on
Yellow "BC OPEN" LED off
Harvest Pump
Timer
50 sec.
PM energized
WV de-energized