Installation Instructions Section 2
2-20
Part Number 000001114
Installation Check List
Is the Ice Machine level?
Has all of the internal packing been removed?
Have all of the electrical and water connections
been made?
Has the supply voltage been tested and checked
against the rating on the nameplate?
Is there proper clearance around the ice machine
for air circulation?
Has the ice machine been installed where
ambient temperatures will remain in the range of
35° - 110°F (1.7° - 43.3°C)?
Has the ice machine been installed where the
incoming water temperature will remain in the
range of 33° - 90°F (0.6° - 32.2°C)?
Is there a separate drain for the water-cooled
condenser?
Is the water trough drain plug installed? (The drain
plug is taped to the top of the water pump).
Are the ice machine and bin drains vented?
Are all electrical leads free from contact with
refrigeration lines and moving equipment?
Has the owner/operator been instructed
regarding maintenance and the use of
Manitowoc Cleaner and Sanitizer?
Has the owner/operator completed the warranty
registration card?
Has the ice machine and bin been sanitized?
Is the toggle switch set to ice? (The toggle switch
is located directly behind the front panel).
Is the ice thickness control set correctly? (Refer
to Operational Checks in Section 3 of this manual
to check/set the correct ice bridge thickness).
Additional Checks for Remote Models
Has the receiver service valve been opened
100%?
Does the remote condenser fan operate properly
after start-up?
Has the remote condenser been located where
ambient temperatures will remain in the range of
-20° - 120°F ( -6.6 - 49°C).
Is the line set routed properly?