Marvel Industries 80RD Refrigerator User Manual


 
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS
6
Pilot Hole Drill Sizes for Wood Screws
Wood Screw Size
Hardwood
Softwood
Work Material
8
3/32
5/64
5/16 PHILLIPS HEAD SCREWS
HOLDING DRAWER FRONT
GASKET
Step 2:
Remove Drawer Fronts
(Note: The overlay panel may be installed without
removing the drawer fronts from the drawer bod-
ies, but the full drawer assembly is not as easy to
handle as the drawer front alone.)
1. Remove drawer from unit. Begin by pulling out
the drawer. Locate the drawer lock which can be
found on the outside of the cabinet slide (fig. 1).
Push the back of the drawer lock forward and
then down, releasing the drawer from the cabinet
slide (fig. 2). Repeat this on the opposite side of
the drawer. Lift the drawer up from the slides at
90° to fully extricate the drawer from the cabinet
(fig. 3).
2. Remove drawer fronts. Do this by removing
the 8 phillips screws and washers securing the
drawer front to the drawer body. Mark lightly with
an erasable marker the position of the stainless
drawer liner as it secured to the stainless drawer
before removing screws.
3. Remove the gasket from the drawer front. Do
this by pulling the gasket out of the channel that
holds it to the drawer front .This will expose the
clearance holes for mounting the overlay panel.
Step 1:
Wood Screws Required
1. A #8 pan head wood screw should be used to
properly secure the overlay panel. A total of 10
screws will be needed.
2. Use only pan head screws.
3. Do not select a screw that is longer than the
wood thickness at the screw locations.
4. Use recommended pilot holes for the frame
material (see chart below).
figure 1
figure 2
figure 3