PRE-INSTALLATION INSTRUCTIONS
INSPECTION FOR SHIPPING DAMAGE
You are responsible for filing all freight claims with the delivering truck line. Inspect all cartons and crates for
damage as soon as they arrive. If damage is noted to shipping crates or cartons or if a shortage is found, note
this on the bill of lading (all copies) prior to signing.
If damage is discovered when the cabinet is uncrated, immediately call the delivering truck line and follow up
the call with a written report indicating concealed damage to your shipment. Ask for an immediate inspection of
your concealed damage item. Crating material must
be retained to show the inspector from the truck line.
INSTALLATION INSTRUCTIONS
NOTICE TO STORE OWNERS / MANAGERS
Moisture or liquid around or under the cabinet is a potential slip/fall hazard for persons walking by or
working in the general area of the cabinet. Any cabinet malfunction or housekeeping problem that
creates a slip/fall hazard around or under the cabinet should be corrected immediately
.
If moisture or liquid is observed around or under a Master-Bilt cabinet, an immediate investigation should be
made by qualified personnel to determine the source of the moisture or liquid. The investigation should
determine if the cabinet is malfunctioning or if there is a drainpipe leaking.
MECHANICAL
Remove front grille and check refrigeration lines to see that they are free (not touching each other or
compressor). Spin condenser fan blade to see that it is free.
Check that all service valves (2) are open. Cut compressor hold-down strap and remove. The springs are
secured for shipping by either tightening bolts or shipping strap. Remove the strap or loosen the hold-down
bolts so that the compressor floats freely. Check all refrigeration lines and electrical conduit for rubbing or
chaffing, paying particular
attention to area where lines enter the cabinet.
Remove cabinet from crate base and slide into location. Cabinet
must be level from side to side and front to back for correct
draining of coil pan and for self-closing doors to operate
correctly. Allow minimum of 4” between back of cabinet and wall
and between top of cabinet and ceiling for proper condensing
unit air circulation.
To comply with Sanitation requirements the cabinet must be
mounted on legs (6” high min.) or casters or the base must be
sealed to the floor with an N.S.F. listed silicone sealant.
To comply with UL requirements the cabinet must have a minimum clearance of 4” at the top, 6” at the
rear and 0” at each side.
GENERAL INSTRUCTIONS
1. Be sure the equipment is properly installed by competent service people.
2. Keep the equipment clean and sanitary so it will meet your local sanitation codes.