Miele 09 898 161 Range User Manual


 
Notes on installation
14
Toe-kick and drop guard
30" and 36" range
The components are located in the
packaging of the range.
48" range
The components are already
mounted.
Installation of the toe-kick
The toe-kick has sheet metal lugs and
magnets by means of which it can be
positioned and attached to the base
of the range.
ĺ Position the toe-kick in such a way
that the sheet metal lugs are facing
the provided holes in the base.
ĺ Push the toe-kick onto the base of
the range until it audibly locks into
place.
Installation of the drop guard
The drop guard covers the gap
between the oven cavity and the door.
ĺ Open the oven door.
ĺ Lay the drop guard over the gap
between the oven cavity and the
door.
ĺ Close the oven door.