Prince Castle 630-ROM4 Pasta Maker User Manual


 
Romar Pasta Cooker
630-ROM4
Safety Information Important!
WARNING!
Indicates information important to the proper operation of
the unit. Failure to observe may result in damage to the
equipment and/or severe bodily injury or death.
CAUTION!
Indicates information important to the operation of the
unit. Failure to observe may result in damage to the
equipment.
Prince Castle reserves the right to change specifications
and product design without notice. Such revisions do
not entitle the buyer to corresponding changes,
improvements, additions or replacements for previously
purchased equipment.
Installation
Pre-Installation General Setup
Pre-installation is the responsibility of the user and should be
completed prior to the shipment of the unit to the location.
Floor drain sink located no further than 10 ft. from the
intended location of the unit.
Electrical hookup box located no further than 5 ft. from the
intended location of the unit. The box should provide three
phase, 240 V protected with a three-phase 30-A breaker. All
terminals should be rated for gauge number 10-4 wire (L1-L2-
L3-Ground).
Dedicated water outlet with manual shut off valve no further
than 7 ft. from the intended location of the unit. The water
pressure should be at least 50 psi. The manual shut-off valve
output has to accommodate ¾ in. NPT Hose connector.
Supporting counter with the minimum suggested dimensions
of 24 in. high, 28 in. deep, and 44 in. wide. The counter must be
capable of withstanding 340 lbs (weight of unit).
This unit is completely pre-wired and thoroughly tested prior to
shipment. All wiring and hookups shall be done without
opening the unit.
Place unit on the counter. The counter must be designed to fit
the size and support the weight of the unit.
The unit must be level to insure proper function. To level the
unit, use only the adjustable leveling feet (no shims or foreign
objects).
EPH require a minimum height of 4 in. between the counter
and the unit.
Plumbing Connections
It is highly recommended that a licensed plumber install all
plumbing connections.
All pre-installation and installation work must be in compliance
with national and local plumbing codes and health department
requirements.
For standard water installation, connect per local plumbing
codes.
The drainage from the unit to the floor sink is achieved by
gravity only. Make sure that the 1” white PVC tubing is directed
downwards preventing any back-flow to the unit. Most local
Health Departments require you to terminate the drainage tube
4 in. above the highest point of the floor-sink.
When connecting the steam generator blow-down outlet,
ensure that the valve (provided by Prince Castle) is reachable
(arms length) from the front of the unit. The connecting “black
pipe” must be installed behind the unit and below the counter,
away from easy reach. The blow-down piping must be
secured all the way to the floor sink.
Do NOT reduce the blow-down outlet from its original size.
Depending on local regulations, you may be required to
install a second check valve or pressure reducing back-
flow preventive device.
Printed in USA 0404 © 2004 2 630-500