Proline PLFW102 Ventilation Hood User Manual


 
10 |
PROLINE
RANGE HOODS
USER MANUAL | 11
step 3
wall hood installation
wall hood installation
Hang hood and connect
step 2
Install ceiling bracket
Place the chimney bracket against the ceiling
Find the center point of the bracket and mark
it
Line the bracket center point with the center
point on the wall
Mark the locations of bracket holes on wall
Drill holes into the wall where you’ve marked
Install wall anchors into these holes
Screw ceiling bracket into place
Chimney will mount on this bracket
Carefully hang the hood on the wall, attaching it
to the studs using the screws already in place
Line up bottom of range hood with your bottom
line on the wall
Tighten and anchor the hood to the wall
Make sure to anchor the hood to a stud so the
wall can support the weight of the range hood
Attach your ductwork to the top of the hood
Duct tape into place
Find the three pronged plug and connect to an
electrical outlet
step 5
Install grease filter
step 4
Install chimney
Take off protective laminate coating
Place the chimney on top of range hood base
Make sure the chimney is facing the correct
direction (the vertical vent should be on the
top)
Secure the lower portion of the chimney to the
base of the hood
Attach the chimney to the ceiling mounting
bracket
Screw the chimney into place on both sides
Now the chimney is secured to the ceiling and
wall
Peel off any protective tape or film.
Pop spring loaded filter into place
That’s it! Now you’re ready to try out your new
range hood