FOR THE INSTALLER
Final Check List
1. Is the ice system installed indoors in a
location where the air and water
temperatures are controlled, and where
they do not exceed the design limitations?
2. Is there an electrical service disconnect
within sight of the installed machine? Has
the voltage been checked, and compared
to nameplate requirements?
3. Have all the plumbing connections been
made and checked for leaks?
4. Has the machine and bin been leveled?
5. Is there a minimum of 6" clearance at the
back of the machine for proper service
access and air circulation?
6. Is the water pressure a minimum of 20
PSIG?
7. Has the machine been secured to the bin?
8. Is there clearance over the top of the
machine for service access?
9. Is there a water shut off valve installed near
the machine?
10. Have all of the shipping blocks been
removed?
NME454, 654 & FME504, 804
January 2007
Page 8