Scotsman Ice FME804 Ice Maker User Manual


 
BIN CONTROLS (Ice Level Sensors)
1. Disconnect electrical power.
2. Remove front panel.
3. Remove control box cover.
4. Locate ice chute, at the base of the chute, in
front of and behind it are two plastic bin control
mounts.
5. Slide each bin control to the left, and in the
control box, disconnect the electrical leads
connecting the bin control to the circuit board.
6. Reverse to reassemble, be certain that the bin
controls are aligned so that the ice level sensors
are visible (centered) through the holes in the ice
chute.
NME454, 654 & FME504, 804
January 2007
Page 14
ICE
CHUTE
SLIDE BIN
CONTROLS
LEFT AND
RIGHT
REMOVAL AND REPLACEMENT: Bin Controls
RESERVOIR
1. Shut off water supply.
2. Remove front panel.
3. Remove reservoir cover.
4. Disconnect water inlet tube from reservoir inlet
fitting.
5. To remove float valve, push in on “Locking Tab”
as shown and pull valve up.
Note: The plunger/seat is available as a separate
part.
6. To remove reservoir, pull up and remove water
sensor.
7. Disconnect water outlet tubes.
8. Remove the two screws holding reservoir to
bracket.
9. Remove reservoir from ice machine.
10. Reverse steps 1-9 to reassemble.
LOCKING
TABS
FLOAT
ASSEMBLY
Water
Sensor