Sears 183.91579 Beverage Dispenser User Manual


 
Check all supplied accessories in the carton to be sure that
all pieces are present and in good condition. A checklist of
accessories is shown below for your reference:
1 Beer Tap Assembly Including:
1 Black Faucet Handle
1 Gasket for Beer Tap
1 Beer Line (transparent tube) attached to Beer Tap
1 Black Rubber Washer for Connection of
Beer Line to Keg Tap
1 CO2 Regulator
1 CO2 Cylinder
1 Keg Tap (American Sankey Type)
1 Cleaning Kit
1 CO2 Gas Line (Red Tube)
2 Hose Clamps
1 CO2 Cylinder Retainer (with bolt and nut)
1 Guardrail
1 Drip Tray
4 Casters
1 Wrench (for casters)
4 Large Phillips-Head Screws
8 Small Phillips-Head Screws
2 Retainer Mounting Screws
2 Wire Shelves
4 Support Pins
Installing the Casters
Follow the steps below to install the
casters.
1. Empty the inside of the cabinet
completely and lay the beer dis-
penser down sideways. We rec-
ommend that you place a piece of cardboard or cloth
underneath the cabinet to prevent dents or scratches to
the cabinet.
2. Insert the casters into the holes on the bottom corners
of the cabinet. Tighten each caster by turning the nut
clockwise with the wrench provided.
3. Once all four casters have been tightened evenly, stand
the cabinet in an upright position.
Leveling your Beer Dispenser
If you do not install the casters, you will have to level your
beer dispenser.
Your beer dispenser has 4 leveling legs which are located
in the front and rear corners. After properly placing your
beer dispenser in its final position, you can level it.
Leveling legs can be adjusted by turning them clockwise
to raise or counterclockwise to lower your beer dispenser.
The beer dispenser door will close easier when the level-
ing legs are extended.
Installing the Beer Tap
Follow the steps below to install the beer tap.
1. First, remove the cabinet plug located on the worktop.
Firmly grasp the cabinet plug, twist and pull upward.
Note: Store this plug in a safe place as it will be
required when converting the beer dispenser
into a beverage cooler.
2. Place the gasket over the hole opening on the
worktop and line up 4 holes with pilot holes.
3. Pass beer line with the nut at the end through the hole
in the worktop until the beer tap is resting on top of the
cabinet.
4. Align the holes of the beer tap flauge with the gasket
and pilot holes on the worktop of cabinet. Make sure
faucet faces the front.
5. Secure the beer tap to the cabinet with four large
Phillips-Head screws.
Installing the Guardrail
Follow the steps below to install the guardrail on the
worktop.
1. Place the guardrail on top of the cabinet.
2. Align all holes of the guardrail with the holes of the
cabinet.
3. Secure the guardrail to the cabinet with eight small
Phillips-Head screws.
Installing the CO2 Regulator and CO2 Cylinder
Follow the steps below to safely install the CO2 regulator
and CO2 cylinder. You must read and understand the
following procedures for CO2 cylinders before
installation.
Note: Your CO2 cylinder is shipped empty to avoid any
possible accidents during transportation. When you
purchase the first keg of beer, have your beer
distributor fill the CO2 cylinder.
1. Install the CO2 gas line tube to the regulator by
attaching one end of the red tube to the hose barb
connection on the CO2 regulator. Secure the tube by
using one of the two self-locking plastic snap-on clamps.
Use pliers to snap the clamp on tightly to ensure that
there are no leaks.
Caster
Wrench
Nut
4
Large Philip Head
Small Phillips Head
Beer Tap Assembly
Gasket
Beer line
Guard Rail
nut
Faucet Handle
pilot holes