3
6 INSTALLATION HARDWARE
T
he INSTALLATION HARDWARE (items
1-7)
packed with the oven should contain the following:
I
TEM NAME QUANTITY PART CODE
1 Wood Screw 5 X 30 mm 6 XTSS750P35000
2 Toggle Bolt #10 - 24 X 50 mm 4 LX-BZ0195WRE0
3 Top Cabinet Screw 5 X 60 mm 2 XBRS750P60000
4 Flat Washer 30 mm diameter 2 XWHS750-16300
5 Grommet 1 LBSHC0040MRE0
6 T
apping Screw 4 x 12 mm 1 XOTS740P12000
7 Exhaust Damper Assembly 1 FFTA-B004MRK0
Figure 5
7 PREPARATION OF THE OVEN
Utilization of the carton may make installation easier.
1. Open the bottom of the carton, remove oven and all packing materials.
2. CHECK THE OVEN.
Check the oven for any damage, such as misaligned or bent door, damaged door seals and sealing
surfaces, broken or loose door hinges and latches and dents inside the cavity or on the door. If there is
any damage, do not operate the oven and contact your dealer or SHARP AUTHORIZED SERVICER.
3. Place carton upside down as shown in Figure 6-1.
4. Using cutting line around the carton, cut into two pieces (A) and (BC). See Figure 6-2.
5. Cut the remaining portion (BC) into portion (B) and portion (C) according to cutting line. See Figure 6-3.
(B)
Figure 6-1
(C)
Figure 6-2
T
op side
(A)
Figure 6-3
Cutting line
(B)
(C)
(A)