HRX-OM-J049-A
Chapter 4 Startup and Shutdown
HRG010-W HRG015-W 4.1 Pre-check
1st edition : Aug. 2006
Rev. A: May. 2007
4-1
Chapter 4 Startup and Shutdown
4.1 Pre-check
Check the following items before starting up the unit.
4.1.1 Installation condition
z
Make sure the unit is installed horizontally.
z
Do not put any heavy object on the unit or apply excess force by piping.
4.1.2 Electric wiring
Check that the power cable, ground and I/O signal cables are correctly connected.
4.1.3 Facility water piping
Check the I/O piping of the facility water is installed correctly.
4.1.4 Piping for circulating fluid
Check the I/O piping of the circulating fluid is installed correctly.
4.1.5 Supply of circulating fluid
Check the fluid level is within the specified range shown on the level indicator.
Personnel with adequate knowledge and experiences of this product
and peripheral devices shall be in charge of starting up and shutting
down the unit.