SPX Cooling Technologies 05-116E Refrigerator User Manual


 
34
Increased load requirements: MH Fluid Coolers are designed so that
cells of either equal or unequal capacity can be added in the future. This
allows you to compensate for the load increases that normally occur with
the replacement or addition of production equipment—and still retain
continuity with respect to your fluid cooler system.
Fluid cooler rebuilding: SPX routinely rebuilds and upgrades fluid coolers
and cooling towers of all materials and manufacture. If your product ever
reaches the limit of its service life, we recommend that you investigate the
cost of rebuilding before you routinely order a new replacement tower.
Each MH Fluid Cooler includes a document package containing general
orientation drawings, and tower component manuals. These documents
contain important information relating to safe installation and operation
of the fluid cooler. Field installation is required for fan guards (double flow
models), piping inlets and piping outlets. Some optional accessories, such
as handrails, ladders and safety cages may also require field installation.
A separate installation drawing or manual for each purchased option is
included in the document package along with bills of material. If you have
purchased an option and can’t find the appropriate installation drawing,
contact your local Marley sales representative before proceeding.
In addition to these specific documents, numerous technical reports are
published by SPX including more detailed information on a variety of cool-
ing tower and fluid cooler operation and service topics. Your Marley sales
representative will be happy to give you copies of these reports at no charge
or you can download copies from our website at spxcooling.com.
For complete parts and service assistance, contact the Marley sales
representative in your area. If you need help locating your representative,
please phone 800 462 7539 or check the internet at spxcooling.com.
Additional Information