i'"'ISTALLATION"
' ,,4STRUCTIONS
2) Using the Loctite on the
screws, install all 3 Chicago
Screw Posts.
3) Inspect the units for level
again.
4) Drill three (3) 3t16" holes
(per specs in Figure 24)
through both outer trims.
5) Using a 1/8" drill bit, drill
into the cabinetry for a pilot
hole.
6) Install all six (6) Seresto the
cabinetry.
Instructions for fastening
Models 501R, 501F, 550,
511, 561, 532, 542 and 590
to cabinetry (see Figure 25):
17t/a _
1) Drill three (3) 3h6" holes
(per specs in Figure 25)
through both outer trims.
2) Drill a Vs" pilot hole into the
cabinetry.
?' 'qstallall six (6) Sems.
HINGE
ADJUSTMENT
Step 16
Ifthe doors are out of
adjustment, the top or bottom
hinge may be adjusted by
removing and discarding the
two small shipping screws.
See Figure 26. The top door
hinges can be adjusted left to
right and in or out by loosen-
ing the three allen head
screws. The bottom door
hinge is equipped with two
adjustment allen head
screws. See Figure 27.
For adjustment, use a 118"
allen wrench to loosen screws
(models 550 and 511 ex-
cluded). This allows the door
to move left to right or in and
out.
NOTE: On Models 532, 542,
561, 501R, 501F and 590
the doors open to 130 °.
An optional door stop kit
(4-20-089-0), which allows a
door opening of approxi-
mately 90 ° is available.
Contact your distributor.
Figure 26
Figure 27
INSTALLATION
CHECK LIST
The importance of the installa-
tion of your Sub-Zero cannot
be overemphasized. The
proper installation of your
unit is the responsibility of
the selling dealer or instal-
ler. The following check list
should be completed by the
installerto insure no part of
the installation has been over-
looked. Any questions or
problems pertaining to the
installation should be directed
to the selling dealer.
[] Is unit operating? If not, is
unit plugged in? Is refrigerator/
freezer control on?
[] Is packing material
removed? (Step 6)
[] Is water supply line con-
nected to compression fitting?
(Step 8)
IAWARNING l
Disconnect power to unit
before checking wiring
connections.
[] Is blocking completed?
(Step 8)
[] Is unit leveled properly on a
solid floor?. (Step 10)
[] Is blocking necessary?
(Step 8)
[] Is drain pan installed
properly? (Step 11)
[] Is toe plate installed?
(Step 11)
[] Isgrille screw back in
position? (Step 12)
[] Are panels installed
correctly? (Step 14)
[] Are doors adjusted?
(Step 16)
[] Does the customer under-
stand the unit's operation?
[] Isthe icemaker switch
turned on? (Models 590,
532, 542 and 561).
(_ive the customer the
warranty packet.
9