............ www.truemfg.com ............
True Food Service Equipment, Inc.
10 10
SHELVING INSTALLATION / OPERATION
INSTALLATION / OPERATION INSTRUCTIONS
INSTALLING BAKERY CASE
SHELVES
Step 1
A. Lift each door up and out of track
(do not disconnect elastic tubing).
Stretch elastic surgical tubing and set
doors on each side of unit.
B. Remove brackets, lights, shelves,
etc. from cabinet interior.
C. Locate shelf supports wrapped
in micro foam and install teeth end
into stainless pilasters located on
interior walls. Adjust to desired height
matching right and left pairs.
See Figure 1 & 2.
D. Locate three horizontal lights
wrapped in micro foam and install
(light side down). Electrical cords
should be on the right to plug into side
receptacle. Hang end hooks of light
assembly on two shelf supports (left
and right) slide assembly forward until
it seats in front notch of shelf support.
Then the stainless steel shelf can be
installed on the shelf supports.
See figures 3.
Wire Shelf Support Brackets:
E. Install rear brackets by sliding end
hooks over rear notch of shelf support.
See figures 4.
F. Locate wire shelves, install top
shelf first. With the front lip (tray
stop) up and towards cabinet front,
place on top of front light assembly
and snap wire shelf into (2) clips on
top of rear bracket. See figures 5.
G. Plug top light assembly into top
receptacle of cabinet interior.
See figures 5.
H. Repeat procedures for remaining
two wire shelves. See figures 6.
I. Replace doors in track.
NOTE:
Lights will not operate if they are
not plugged in or plug cover is
not plugged in.
Figure 1.
Figure 2.
Figure 3.
Figure 4.
Figure 5.
Figure 6.