Vulcan-Hart 1ER50AF Fryer User Manual


 
8
Place fryer as near to its final position as possible. Connect 3 phase line to X, Y and Z on
terminal block. To reach terminal block, remove electric cover plate from fryer.
For each 15½” (39 cm) and 21” (53 cm) section, a 3 phase supply line capable of handling
the required KW at the fryer’s rated voltage (208, 240, and 480) is needed. Refer to the
fryer data plate for this electrical information.
To shield electric connection supply wiring, a permanently connected or direct
wired device must be installed using flexible conduit sleeve with the appropriate
connectors.
LEVELING THE FRYER
Check the level of the fryer by placing a level on top of the fryer after electrical
connections have been made.
Ensure that the fryer is level front-to-back and side-to-side in the final installed position.
If using casters, lock the wheels after unit is level.
OPERATION
Hot oil and parts can cause burns. Use care when operating,
cleaning and servicing the fryer.
Spilling hot frying compound can cause severe burns. Do not move
fryer without draining all frying compound from the tank.
OVER-TEMPERATURE SHUTDOWN
If the shortening becomes overheated, a high-temperature shutoff device will turn the
heating elements off shutting down the fryer.
If the fryer shuts down due to overheating, do not turn fryer on until the shortening
temperature is below 300°F (149°C).
If an overheating situation persists, contact your local Vulcan-Hart authorized service
office.
BEFORE FIRST USE
Cleaning
New units are wiped down at the factory to remove any visible signs of dirt, oil, grease,
etc. remaining from the manufacturing process.