Vulcan-Hart 1ER85D Fryer User Manual


 
— 4 —
Fig. 1
Casters (Accessory)
If it is necessary to disconnect the restraint, unplug electrical
supply before disconnection. Reconnect the restraint before
plugging the electrical supply in and returning the fryer to its
installation position.
Instructions for installing casters to the fryer are included with
the casters.
LEVELING
Place a carpenter's level on top of the fryer and level the fryer
front-to-back and side-to-side by turning the adjustable legs or
casters.
ELECTRICAL CONNECTIONS
WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE NATIONAL
ELECTRICAL CODE AND/OR OTHER LOCAL CODES.
WARNING: DISCONNECT THE ELECTRICAL POWER SUPPLY TO THE MACHINE AND FOLLOW
LOCKOUT/TAGOUT PROCEDURES.
WARNING: APPLIANCES EQUIPPED WITH A 120V FLEXIBLE ELECTRIC SUPPLY CORD ARE
PROVIDED WITH A THREE-PRONG GROUNDING PLUG. IT IS IMPERATIVE THAT THIS PLUG BE
CONNECTED INTO A PROPERLY GROUNDED THREE-PRONG RECEPTACLE. IF THE
RECEPTACLE IS NOT THE PROPER GROUNDING TYPE, CONTACT AN ELECTRICIAN. DO NOT
REMOVE THE GROUNDING PRONG FROM THIS PLUG.
Place fryer as near to its final position as possible. Connect 3 phase line to X, Y and Z of terminal block.
To reach terminal block, remove electric cover plate from fryer.
For each 15
1
/2" (394 mm) and 21" (533 mm) section, a 3 phase supply line capable of handling the
required KW at the fryer's rated voltage (208, 480) is needed. Refer to the fryer data plate for this
electrical information.
If a fan interlock is needed, it should be connected to 1 and 2 on the four pole barrier strip. 1 and 2 go
to a set of dry contacts on the power switch.