18. Separate union at boiler drain.
19. On models with cooking compartments:
A. Remove the left and right access panels
between the cooking compartments and
boiler base.
B. Disconnect flexible steam supply line from
boiler tee to cooking compartments and
remove the line.
C. Disconnect both drain lines from cooking
compartments to condenser drain box and
remove the lines.
20. On models
with steam generator base only,
disconnect steam supply line from boiler tee.
21. Loosen conduit nut on field connection box and
slide nut down onto conduit.
22. Remove cover from field terminal box and
disconnect lead wires from terminal block.
23. Remove main control box and pressure switch
control box from boiler base.
24. Remove bolts securing boiler to base frame
then slide boiler forward to remove.
25. Remove all plumbing components from boiler
and install on replacement boiler.
26. Install replacement boiler but hand tighten
mounting bolts only.
27. To complete boiler installation, reverse
procedure from main control box and pressure
switch control box removal.
28. When all connections to boiler are made,
tighten boiler mounting bolts to secure boiler to
base frame.
29. Check for proper operation.
DESCALER (Cathodic Protector)
NOTE: The descalers are accessible only through
the heating element mounting plate opening in boiler.
1. Remove heating element mounting plate as
outlined under HEATING ELEMENT
MOUNTING PLATE.
2. Remove the two descalers hanging from the
front horizontal support rod.