Vulcan-Hart SG6C ML-114878 Convection Oven User Manual


 
— 8 —
ASSEMBLING STACKED OVENS
Unpack the ovens and stack kit. Position the oven to be used as the bottom oven on its back for access
to the oven bottom, taking care not to scratch or damage it. The gas pipe protrudes beyond the back;
provide for this when the oven is tipped back by resting it on suitable spacers (2 x 4's [51 x 102 mm],
etc.). Attach the four leg assemblies with the 24 bolts and lockwashers (6 per leg).
Place the lower oven (with legs/casters) on the floor and remove two
7
/16" (11 mm) diameter knockouts
on each side of the top cover. Remove vent guard and discard it.
Move the oven (with legs/casters) to the installed position and place upper oven on top of lower oven
using the locating studs.
Remove the rear panel from the TOP oven. Install the two-piece stacking common flue (Fig. 3) with
the four screws provided. Replace the top oven rear panel.
Connect the piping between the top oven and bottom oven. Pipe compound must be suitable for the
type of gas being used (natural or propane).
Fig. 3
VENT GUARD
TWO PIECE
STACKING
COMMON FLUE
PL-52884