5
Oval and SweetHeart:
1. Assemble the bell dampers (Fig. 2).and thread into the
three locations, one at the front in the ash pan door, and
two on the firebox side.
2. Insert a piece of 6” diameter black smoke pipe into the flu
and secure with three sheet metal screws.(see page 10,
"Stovepipe Chimney Connection Reqiurements")
Cabinet Assembly
(Oval and SweetHeart)
:
See the manual entitled "Cabinet Assembly Instructions for
Gas,Electric,Combination and Wood Stoves" which is
included in the cabinet box.
Once the cabinet has been assembled and installed, follow
these few remaining steps:
1. Insert the lift handle( #1361) through the bracket and bolt
it through the hole in the cooking surface with the screw
and locknut.
The handle should be able to pivot freely from this point.
Tighten the nut securely, so it can't work loose under
normal use.
2. The three pronged tool holder (#1440) is used to hang the
lid lifter, poker and scraper.
To mount the holder, locate the two 1/4” holes on the
firebox side of the warming cabinet back. Fasten with the
bolts supplied.
3. A pipe damper installation is optional depending on your
installation and chimney configuration. Your dealer can
supply you with a damper.
The damper installation should be done before final assembly
of the chimney.
a) Open the front cabinet door.
b) Mark the spot for drilling in the back of the pipe by
pushing the sharp end of the damper rod into the back wall
of the pipe before drilling.
c) Drill a 1/4” hole in the middle of the smoke pipe
through the centre of the hole in the back of the cabinet.
d) Follow the instructions that came with the damper and
install the damper inside the cabinet with the handle of the
damper also inside the cabinet.
e) Make sure the damper disc rotates freely inside the
pipe.
Figure 2
Bell Damper
nut
lockwasher
#1361 lift handle installed
on cooking surface
cooking surface
lift handle