![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/e/df/edfb6bee-a729-4a9d-9391-763fa77c697e/edfb6bee-a729-4a9d-9391-763fa77c697e-bg196.png)
11-8 FINAL DRIVE
Drive Chain
○
Screw in the pressure bolt assy [A] in the pressure bolt
(A) [B].
○
Install the handle lever [C] to the pressure bolt assy.
○
Turn in the handle lever until the link pin [D] removed at
the link plate [E].
•
Repeat the above steps for other link pin [A].
Drive Chain Installation
•
Engage new drive chain to the old drive chain and pull
the end of the old drive chain until they are changing the
position.
•
Remove the old drive chain from the new drive chain.
•
Apply grease to the link pins [A] and grease seals.
•
Engage the drive chain on the rear sprocket through the
swingarm.
•
Install the grease seals [B] on the link pins.
•
Insert the link pins in the drive chain ends.
•
Install:
Grease Seals [C]
○
Set the adjuster bolt (yellow) [A], wedge holder and wedge
pin [B], and pressure holder [C] on the body [D].
○
Hold the wedge holder and wedge pin, using the adjuster
bolt (yellow).
○
Apply grease to the inside [E] of the pressure holder.