818 36 55-00/3 19
Prior to Initial Start-Up
1
Before connecting the appliance to the mains and putting it into ope-
ration for the first time, leave the appliance to stand for 30 minutes if
was transported upright. After transport on its side, the appliance must
be left to stand for 2 hours before putting it into operation. This is
necessary to allow the oil to flow back into the compressor. Otherwise
the compressor may be damaged.
0 1. Please clean the appliance interior and all accessories prior to initial
start-up (see section: "Maintenance and Cleaning").
2. The appliance must be correctly installed in accordance with the chap-
ter "Installation" before it is put into operation for the first time. Care
should be especially taken that the mains voltage and frequency avail-
able correspond with the appliance’s rating plate.
3. Remove the cold accumulation block from the appliance.
4. Place the cold accumulation block into a drawer only after the optimal
storage temperature of -18 °C has been reached, and allow to freeze.
5. After 24 hours place the cold accumulation block at the front of the
upper drawer.
6. Re-freeze the thawed cold accumulation block in the same fashion, e.g.
after cleaning the appliance.