Alto-Shaam QC-20 Refrigerator User Manual


 
QUICKCHILLER INSTALLATION/OPERATION/SERVICE MANUAL 5.
S I T E I N S TA L L AT I O N
I N S T A L L A T I O N
WATE R DR AI NA GE
A 1/2" I.D. (12,7mm) PVC pipe is furnished with
each QC-50 and QC-100 model. Use PVC glue to
attach the pipe into the drain opening at the rear of
the unit. Insert the PVC pipe into the drain opening
with a 1/4" (6mm) clockwise turn. Connect the PVC
pipe to discharge through an indirect waste pipe into
an open-site drain by means of a 2" (51mm) air gap.
Connection must be within 10' (3m) of the unit.
NOTE: In the U.S.A., this equipment is to be
installed to comply with the Basic Plumbing
Code of the Building Officials and Code
Administrators International, Inc. [BOCA],
and the Food Service Sanitation Manual of
the Food & Drug Administration [FDA].
DRAINAGE:
QC-3 QC-20 QC-40
EVAPORATOR PANS: NO INSTALLATION REQUIRED
QC-50 QC-100
ONE (1) FLOOR DRAIN:
1/ 2" (12,7mm) DIAMETER
DRAIN OPENING
AT REAR