QUICKCHILLER • INSTALLATION/OPERATION/SERVICE MANUAL • 5.
SITE INSTALLATION
INSTALLATION
Trolley Guide Installation
1. Align each guide rail with the holes located under
the cabinet.
2. Fasten each guide rail with washer, lock washer and bolt.
3. Push the roll-in cart (trolley) into the Quickchiller and
close the door.
4. At the front of the Quickchiller, make certain contact
has been made between the Quickchiller and the cart
along the total width of the door to create a complete
seal. When a full seal has been determined, recheck each
connection to make certain it has been fully tightened.
GUIDE INSTALLATION FOR TROLLEY OPTION ON QC2-100 & QC2-100/REMOTE