American Panel BCCP-2 Freezer User Manual


 
INSTALLATION
13
PHOTO #9
C. Refrigeration Unit Installation
C.1. Preparation
9 Check the integrity of the unit once it is unpacked
9 Check to make sure the floor is leveled
9 Check that the available power supply corresponds to the ratings on the unit’s nameplates and correctly rated
electrical protection is provided.
9 If additional refrigerant should be needed, be certain to use the correct type.
9 Make certain that adequate drainage is provided.
9 If a remote condensing unit is used, be certain that it is positioned within the range indicated in this manual and that it
is connected as specified and in accordance with all applicable electrical codes.
C.2. Find The Location
Ambient air temperature for air-cooled condensing units must be no greater than 95° F to ensure the rated performance.
The condensing unit must be located away from direct sunlight if installed outdoors; or, if it is indoors, it should be in an
appropriate room in which air change is guaranteed to be no less than 318,000 cubic feet per hour.
SPECIFICATIONS TO USE DURING INSTALLATION:
i) CABINET
AP40BC250-12
BCCP-1
AP40BC250-2-12
BCCP-2, BCIP
ii) AIR COOLED
REMOTE CONDENSING UNIT
(4HP)(OPTIONAL)
Voltage 120/208V 120-208V 208V
Phases 1 1 3
Amperage 10 20 20
Circuit size 15 30 30
Power supply cable 12-4 10-4 10-4
Note: The condensing unit and the cabinet must be connected to separate