Bunn A10 Coffeemaker User Manual


 
8
PREPARING THE BREWER FOR USE
NOTE: THE BREWER IS NOT READY TO PLUG IN
Raisethehingediplid.
Place the decanter on the warmer. Pour two pitchers of water
(filled to the top line) into the screened area on top of the brewer.
Wait two minutes between pitchers to allow the water to fill the
tank.Whenthetankisfull,somewaterwillowthroughthe
funnel and into the decanter.
Close the lid and plug in the brewer.
Press the top of the vacation switch, located on the
lower left side of the brewer, to the “ON” (I) position.
The vacation switch controls power to the tank heater.
Initially you will have to wait approximately ten minutes
in order for water to reach brew temperature.
P2078
P2079
P-214
P2080.15
ALL MODELS
43422.1 010311