Bunn ULTRA-2 Beverage Dispenser User Manual


 
31
REQUIRED REGULAR MAINTENANCE:
Semi Annual:
Bunn #34245.0000 is required to perform the semi
annual Preventive maintenance:
Note: Service caused by failure to perform required
maintenance is not covered by warranty.
The following instructions apply to one hopper only;
repeat each step for all hoppers.
Kit Contents
Inventory this kit for completeness before proceeding.
Part Number Qty. Description
27446.0000 2 Lamps, T-5 Wedgebase Min.
26781.0000 2 Auger Shaft Bushing (Blue)
26782.0001 2 Cooling Drum Seal
32079.0000 2 Hopper/Drum Seal
32268.0000 2 Seal, Faucet (Clear)
29563.0000 - Lubricant (“Krytox”)
28395.0000 1 Seal Insertion Tool
INSTRUCTIONS
WARNING - Disconnect the dispenser from the power
source before the removal of any panel or the replace-
ment of any component.
1. Drain, remove and clean hopper; refer to the Operating
and Service Manual for proper cleaning procedures.
Discard the hopper/drum seal and faucet seal.
2. Remove the #8 locking screws securing auger motor
cover to the cooling drum mount assembly; remove
cover and set aside for reassembly.
3. Remove the #8 locking screw on the lower right side
(viewed from front) of the auger motor mounting
bracket securing the auger motor run capacitor. Set
capacitor aside with wires attached.
4. Disconnect the auger motor terminal from the terminal
on the main wiring harness.
5. Remove the remaining #8 locking screws securing
the cooling drum mounting bracket. Remove motor
with mounting bracket.
NOTE: When removing or installing motor and shaft as-
sembies, be sure the motor and shaft pins are turned to a
position that will clear the torque sensor circuit board.
FIG 1
Auger Motor Cover
Auger Motor Assy
Auger Shaft Assy
Cooling Drum
Hopper/Drum Seal
Auger Shaft Bushing
Cooling Drum Seal
P2528
Run Capacitor
32080.0001 022707