Bunn IC3 & IC3B Coffeemaker User Manual


 
Page 5
10792 050405
PLUMBING REQUIREMENTS
This brewer must be connected to a cold water system with operating pressure between 30 (207 kPa) and 90
psi (620 kPa) from a
1
2” or larger supply line. A shut-off valve should be installed in the line before the brewer.
Install a regulator in the line when pressure is greater than 90 psi(620 kPa) to reduce it to 50 psi (345 kPa). The
water inlet fi tting is
1
4” fl are.
NOTE - Bunn-O-Matic recommends
1
4” copper tubing for installations of less than 25 feet and
3
8” for more than 25
feet from the
1
2” water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water fl ow.
This equipment must be installed to comply with the Basic Plumbing Code
of the Building Offi cials and Code Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).
Plumbing Hook-Up
1. Attach the female fi tting from the short piece of tubing on the strainer assembly (supplied) to the water inlet
tting on the rear of the brewer.
2. Flush the water line and securely attach it to the fl are fi tting on the strainer assembly.
3. Turn on the water supply.