Page 29
SERVICE (cont.)
DIGITAL BREW TIMER (Late Models)
FIG. 29 DIGITAL BREW TIMER
P2211.40
LATE MODELS
Location:
The timer is located inside the front of the trunk on
the top of the component bracket.
Test Procedure.
NOTE: Do not remove or install wires while timer board
is installed. Pressure applied to one side may cause
damage to the board.
1. Disconnect the brewer from the power source and
remove the front access panel.
2. Remove the two #8-32 screws securing circuit
board to the mounting bracket.
3. Remove circuit board and spacers (as required).
4. With a voltmeter, check the voltage across termi-
nals TL1 and TL2 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source. The indication must be 230 volts ac.
5. Disconnect the brewer from the power source.
If voltage is present as described, proceed to #6.
If voltage is not present as described, refer to the
Wiring Diagrams
and check the brewer wiring har-
ness.
6. With a voltmeter, check the voltage across termi-
nals TL1 and TL4 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source. The indication must be 0 volts.
If voltage is as described, proceed to #7.
If voltage is not as described, disconnect the brewer
from the power source and replace the timer.
7. With a voltmeter, check the voltage across termi-
nals TL1 and TL4 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source and press the "START" switch. The indica-
tion must be 230 volts ac.
If voltage is present as described, the brew timer is
operating properly. Reset the timer as required, to
obtain the desired brew volume.
If voltage is not present as described, disconnect the
brewer from the power source and replace the timer.
Removal and Replacement:
1. Remove the two #8-32 screws securing circuit
board to the mounting bracket.
2. Remove circuit board and spacers (as required).
3. Remove all wires from the timer.
4. Attach all wires to the replacement timer board
prior to installation to the component mounting
bracket. Refer to FIG. 30 when reconnecting the
wires.
5. Install new circuit board with spacers (as re-
quired) to the component mounting bracket.
6. Adjust the timer as described below.
Timer Setting:
NOTE: Prior to setting or modifying volumes, check
that the brewer is connected to water supply, the tank
is properly filled, and a funnel support, funnel and
funnel cover are in place.
NOTE: All volume settings must be done with the
swing spout shield installed.
1. Modifying brew volumes. To modify a brew vol-
ume, first check that the SET/LOCK switch is in the
“SET” position on the circuit board.
To increase a brew volume, place the ON/OFF
switch in the “ON” position, press and hold the START
switch until you see three breaks in the water stream
from the swing arm. Release the switch and press it
again one or more times. (Failure to release the switch
10067.3 070102