Bunn SRUA Coffeemaker User Manual


 
Page 19
SERVICE (cont.)
LIQUID LEVEL BOARD AND LEVEL PROBE (cont.)
T1 BLU to Solenoid Valve
T2 RED to ON/OFF Switch
T3 BLK to Main Harness
T4 PNK to Level Probe
FIG.11 LIQUID LEVEL BOARD TERMINALS
P1733.50
Removal and Replacement:
1. Remove all wires from the liquid level board.
2. Remove the #10-32 screw and flat washer secur-
ing the protective shield to the component bracket.
3. Remove the #10-32 screw and internal tooth
lockwasher securing the liquid level board to the
component bracket.
4. Remove liquid level board and discard.
5. Install new liquid level board on component bracket
and secure with a #10-32 screw and internal tooth
lockwasher.
6. Install protective shield and secure with #10-32
screw and flat washer.
7. Refer to Fig. 11 and reconnect the wires.
10067.3 070102