Dacor 100500 Refrigerator User Manual


 
10
insTallaTion insTRuCTions
waTeR line ConneCTion
Plug in RefRigeRaToR
move uniT To final PosiTion
IMPORTANT: To prevent floor damage, make sure levelers are
raised (not touching the floor) and the unit is on rollers before
moving.
Place top of cardboard carton or plywood under refrigerator.
Remove unit from dolly.
Do not remove protective film.
Move the refrigerator straight back and evenly into the rough
opening. Verify that the water tubing is not kinked and the
power cord is not kinked.
1. Verify that the switch in the top
cabinet is in the OFF position.
2. Plug into a grounded 3-prong
outlet.
WARNING
ELECTRICAL SHOCK HAZARD – Plug into a grounded 3-
prong non-GFCI outlet. Do not remove ground prong. Do not
use an adapter. Do not us an extension cord. Failure to do so
can result in death, fire, or electrical shock.
Before attaching the copper tubing to the unit, flush at least
2qt (1.9L) of water through the copper tubing into a bucket to
get rid of any particles in the water line.
Check for leaks around the saddle valve. Do not overtighten
the clamp or sleeve. This will crush the copper tubing.
Make connection to the refrigerator.
Turn shutoff valve ON.
Check for leaks, Tighten any nuts or connections (including
connections at the valve) that leak.
level uniT
Slide the unit in place and raise the front and rear levelers
until the unit touches the brackets. (Use a 3/8” socket to
raise and lower the unit.)
Check to see whether the refrigerator is level left to right, by
opening the doors and place a level on top of the refrigerator
frame as shown.
Use the leveling bolts to adjust the leveling legs until the
refrigerator is level from left to right.
Check to see whether the refrigerator is level from front to
back, by placing the level(s) on the shelf or shelves.
Use the leveling bolts to adjust the leveling legs until the
refrigerator is level from front to rear.
Verify that all 4 leveling legs contact the floor and support
the full weight of the refrigerator.
Make final check to ensure that the refrigerator is level.
Install the kickplate.
Main Power and
Fahrenheit/Celsius
Switches