15
INSTALLATION
2. Install the two brackets to the chimney structure supplied with the kit by using one screw each
side.
3. Join the two top sections of the duct cover.
Screw the two sections together with 8 screws (4 each side- see the top view in Fig. 16 for
joining the two sections).
4. Install the top duct cover assembly to the bracket, near the ceiling, with two screws (one each
side).
Bracket
Duct cover
Top section
Duct cover
Top section
Bracket
Screw
Fix to the top
Top Duct
assembly
Diagram
Drive a #10 x 2-1/4"
screw into wood
framing above
ceiling. This screw
supports the load of
the upper chimney
duct cover. One
screw each side.
FIG. 16