DCS 221712 Ventilation Hood User Manual


 
16
INSTALLATION
5
. Join the two bottom sections of the duct cover which covers the chimney structure using 6
screws, (3 each side, see Fig. 17 for the plan diagram for joining the two sections).
6. Insert the bottom section of the duct cover in its seat so that it completely covers the chimney
s
tructure.
7. Install the 4 supplied trims for duct cover channels to cover the fasteners of the bottom duct
covers. (CAUTION! THE BOTTOM FLUE TRIMS ARE THE NARROWER AND SHALLOWER ONES).
The wider and deeper trims are those used for the top flue, and must be cut to size.
If necessary, slightly expand the trims to ensure their adherence to the flue.
8. Turn the power on again at the electrical panel and check for correct hood operation.
9. Make sure to leave this
manual for the home owner.
D
uct cover
Rear Bottom
s
ection
Duct cover
Front Bottom
section
Bottom Duct
assembly
Diagram
Screw
X
X
Tabs
FIG. 17