NOTE: It is good practice to:
Fit an Earth Leakage Circuit Breaker to your
house wiring.
Wire your appliance to the latest IEE
regulations.
THINGS TO NOTE
This appliance is designed to be fitted between
cabinets with the recommended dimensions as
shown in Fig. 3 & 4.
If there is an existing housing unit it must be
removed.
The dimensions given provide adequate air
circulation around the unit within the cabinet,
ensuring compliance with BS EN60-335.
This appliance must not be installed on a
wooden base board.
Enquiries regarding the installation of the
cooker point if required should be made to your
Regional Electricity Company to ensure
compliance with their regulations.
The cooker point should be within 2m of the
appliance to make it accessible to switch off the
appliance in case of an emergency.
To protect the hands wear gloves when lifting
the oven into its housing.
NOTE: HOUSE CIRCUIT
Earth leakage / continuity tests must be carried
out before the appliance is connected to the
mains supply and re-checked after fitting.
38
INSTALLATION INSTRUCTIONS
Fig. 3
Fig. 4