1-3
Step 10d - Remove last two screws
and pull conveyor away from housing.
Step 10c - Remove
these four hex head
screws and two nuts.
Step 10b - Remove
cartridge heater.
Step 10a - Remove drive pulley.
11. To remove the toasting conveyor assembly:
(See illustration on following page.)
a. Detach the platen and probe wiring from the relay, high-limit, and 9-pin connector.
b. Loosen the setscrew in the second drive pulley from the front and remove the pulley.
c. Remove the five flange nuts that secure the idler assembly to the housing and remove the idler
assembly.
d. Remove the two hex head screws shown in Step 11d of the illustration on the following page.