Thehoodfeatures an upward blow-outopening.
For layingthroughtheoutsidewall, we recommend
useofourtelescopic wall boxTM150-045.
Note:
To prevent the penetrationofwater, e.g.
condensationorrain water fromanuncovered
exhaust air shaft,intothehood,ourcondensation
collectorRV060-150mustbefitted in the
proximity ofthehood.Thecondensationcollector
muststillbeaccessibleafterinstallation.
Circulating air operation
Thefollowingparts should have been included if
you decided in favor of circulating airoperationof
thehood:
•
for AH 900-761
Activated charcoalfilterKF900-055
•
for AH 900-791
Activated charcoalfilterKF900-090
•
Airbaffle LL 010-000
Theairbaffle is secured on the cabinetfront,
blowingouttowards the front.Thedistance
betweenthehoodandthe air baffle mustbe
bridgedwithapipeconsistingofnon-combusting
material.Theairoutofthebafflemustbecapable
offlowingbackintotheroom without obstruction.
Whenusingapanelreachingupto the ceiling,
produceanopeninginthispanel.
Note onwooden front panel:
Thehood'shandlerailcannotbereplacedby a
wooden front panel.
Installation
260
40
Fig. 15
Fig. 16
16