GE ZV855 Ventilation Hood User Manual


 
Installation Instructions
INSTALLATION – RECIRCULATING
INSTALL AIR DEFLECTOR AND
UPPER SUPPORT FRAME
The duct connector is shipped inside the deflector.
Snap the plastic connector out of
the deflector and remove. Turn it
over. From the bottom, snap the
connector over the opening.
Slide the assembled deflector into
the upper support frame and secure
with 4 small screws.
Secure the upper support frame to
the ceiling joists and/or cross framing
with the 4 screws provided. For maximum rigidity
and strength, the screws must be driven into the center
of the joists and/or cross framing.
Check to be sure the support frame is level, vertically
and horizontally.
2
MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
Be sure the template is oriented correctly, with the
front of the hood.
Use a plumb to be sure the mounting
holes will provide parallel alignment
with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locations. Use a 5/32bit and drill
approximately 1-1/2 deep.
• Cut wire access hole approximately
1dia.
1
658Dia28
Wire Access Hole
Front of Hood
17
NOTE: Be sure plastic
connector is installed on
the bottom of the
deflector as shown.