GE ZV855 Ventilation Hood User Manual


 
18
Installation Instructions
INSTALLATION – RECIRCULATING
SECURE WIRING
Route house wiring through the ceiling hole
and pull a length to reach the hood junction box.
Tape the wire to the front of the frame support to
prevent damage during installation and service.
4
658Dia19
Ceiling
Support
Frames
Tape
House
Wiring
Front Side
SIZE AND INSTALL DUCTWORK
Measure from top duct connector (Dim. A)
to bottom of support frame.
Subtract 3/4 for hood insertion into the bottom
of the frame.
Cut the 6 dia. duct to the required length.
NOTE: The bottom end of the duct must be flared
slightly, to facilitate installation of the hood.
Install duct up through support frames onto the
duct connector. Push duct up until it is 3/4from
the bottom of the support frame flange. See
illustration.
Seal duct connection with duct tape, making sure
the connection is secured in place.
5
INSTALL LOWER SUPPORT FRAME
Insert lower support frame into the upper support
frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
3
13-5/8