GE Monogram ZIF36N LH Refrigerator User Manual


 
29
Step 1
Remove
handle
Right hand door swing models are illustrated in these
instructions. Follow these instructions for left hand
models.
NOTE: It is best that 2 people install this kit.
Tools and materials required:
#2 Phillips screwdriver
Drill and appropriate bits
Custom door panel
Safety glasses
Center punch
Masking tape
Hammer
Pencil
1/2" thick 12" x 12" min. piece of plywood to protect
floor when drilling
For stainless steel panel, wear gloves to protect
against sharp edges.
Parts List:
A. Handle extrusion (for left hand models)
B. Handle extrusion (for right hand models)
C. Door handle
D. 6 Spacer rings (for Stainless Panels ONLY)
(4 required, 2 extra)
E. 4 Handle standoffs
F. 6 Screws for mounting handle standoffs
(4 required, 2 extra)
G. 6 Set screws (4 required, 2 extra)
H. 3/32" Allen wrench for set screws
This kit provides for the installation of a Tubular
Stainless Steel handle on 1/4" thick decorator door
panel. The door extrusions allow the handle to be
secured to the door structure, rather than to the
custom panel.
Select extrusion for your model, discard other
extrusion.
Open fresh food door to 90°. Remove the screws from
the full-length handle.
Retain screws, discard handle.