GE Monogram ZXR8510 Ventilation Hood User Manual


 
Installation Preparation
3
REQUIRED ACCESSORIES
This book provides step by step instructions to install
the Monogram ZV850 ceiling mounted hood for
recirculating operation.
• One of the following accessory kits is required for non-
vented ceiling mounted installations of model ZV850.
Choose the correct kit according to ceiling heights:
ZXR858 – For 8 ft. ceiling height.
ZXR859 – For 9 ft. ceiling height
ZXR8510 – For 10 ft. ceiling height.
• Order the required accessory at the same time as the
vent hood and have on site before installation.
• Each kit includes decorative duct covers, a support
frame, air deflector and charcoal filters.
PRODUCT DIMENSIONS
The vent hood must be installed 24 min. and 30 max.
above the cooking surface. 25-1/2 is recommended for
best performance and to ensure that the duct cover
meets the ceiling. The cooking surface should be at least
36 above the floor. Installation will be easier if the vent
hood is installed before the cooktop and countertop is
installed.
* 26-1/4” for 8 ft. Ceiling
Using ZXR858 Accessory
38-1/8” for 9 ft. Ceiling
Using ZXR859 Accessory
50-1/8” for 10 ft. Ceiling
Using ZXR8510 Accessory
* The distance between the cooking surface and the bottom of the
hood must be at least 24” and up to 30”. The 25-1/2” recommended
installation height, above the standard 36” countertop, will ensure
duct cover fit to the ceiling.
*25-1/2" Recommended
36" Reference
*Height
to Ceiling
8-1/4"
35-3/8"
27-1/2"