Grindmaster 67710E Coffeemaker User Manual


 
Page 11 American Metal Ware 67710E Coffee Urn
After the Brew is Finished
When the brew cycle has automatically shut off, you should have ten gallons of coffee. The
level will be higher in the liner if you brew with no grounds. If the level is not correct, see
the Adjustment section.
The pump will run for 12 1/2 minutes to spray over the water required for 10 gallons of
coffee. The BREW light stays on while the pump is running. As water in the tank is
used, it is refilled automatically. The FILL light indicates that the fill valve is open. The
light should alternate on and off, even when brewing to both sides. If the FILL light stays
on during the brew cycle, see the Adjustment section for instructions on speeding the
fill rate.
Press the STOP switch if you need to stop the brew. The timer will reset when STOP is
pressed, so be sure the liner is empty before you press START again.
Allow about two minutes for the grinds to stop dripping.
CAREFULLY open the liner cover.
Remove the brew basket, dispose of the used grounds, and rinse the basket.
Replace the basket on top of the liner and close the lid. The lid may be locked again.
Monitor the level of coffee by checking the flashing light labeled COFFEE IN LINER
WHEN LIT. If this light is flashing, the liner is almost empty.