HP (Hewlett-Packard) PS-025 Refrigerator User Manual


 
PS QuarterHorse Series Chillers Page 11
2 Chiller Installation
2-1 Electrical Connections
Check serial tag voltage and amperage requirements and make sure your electrical
service conforms. See Figure 2 on Page 10 for total running amps.
; Electrical connections must comply with all applicable electrical codes.
; The chiller must be grounded in accordance with NEC Article 250.
; Voltage must be within 10% of the chiller’s nameplate rating.
2-2 Process Water Connections
; All external chilled water connections to the process must be of adequate
size.
; See Figure 4 on Page 14 for sizing recommendations.
; The largest possible openings and passages should be provided for the flow
of chilled water through platens, dies, molds or other pieces of equipment.
Important!
Keep any pressure drop in external process piping
to an absolute minimum for optimum unit operation.
To Process
Connect the
TO PROCESS
chilled water supply outlet to the process being cooled.
From Process
Connect the
FROM PROCESS
chilled water return inlet to the return from the process
back into the chiller for cooling and recirculation.
; This chiller model has a strainer on the
FROM PROCESS
return line.