Hobart FT900BD Dishwasher User Manual


 
21
Conveyor Drive Chain
Inspect the drive chain (Fig. 36) regularly and lubricate as required with Hykogeen Concentrate A
(supplied).
Conveyor Shaft Flange Bearings
Located at both load and unload ends of the machine and at the front and back, these bearings should
be lubricated every four months. Grease fittings at each of the four bearings, a grease gun and 16
ounces of Chevron SRI #2 grease are provided for this purpose. Fig. 37 shows one of the take-up units
at the load end; Fig. 38 shows one of the conveyor bearings at the unload end.
Fig. 38
Conveyor Take-Up Unit
Lubricate the two conveyor take-up unit guides at the load ends of the machine at least twice a year
using the Chevron FM Grease ALC EP 2, provided for this purpose.
CONVEYOR SPEED ADJUSTMENT
The conveyor speed comes preset from the factory. Conveyor speed can be adjusted to run faster or
slower by the customer. Refer to User Programming, pages 15 19.
GREASE
FITTING
Fig. 37
GREASE FITTING
CONVEYOR TAKE-UP UNIT
LUBRICATE GUIDES