Hoshizaki M029-897 Ice Maker User Manual


 
22
Control Board (CB) Setting Menu
Category No. Item Range
IM-500SAA
Default
Compressor 37
Compressor Output Selection
DO NOT ADJUST
0: X8 (DC Relay) On
1: X1 (AC Relay) On
1
Anti-Slush
Control
50
Pump De-Energized Time
When temperature at evaporator (cube control)
thermistor drops to 37°F (3°C) in the freeze cycle,
pump de-energizes for the length of time set.
0 to 90 sec.
0=ignore, no anti-slush
(1 sec. increments)
0
51
Anti-Slush Control Water Supply Time
Time inlet water valve is energized while pump is
de-energized if pump de-energized time (CB Setting
50) is greater than 0.
0 to 5 sec.
(1 sec. increments)
0
Hard Water
Control
60
Integrated Value
If hard water control water supply time (CB Setting
61) is greater than 0: After evaporator (cube control)
thermistor indicates temperature of 32°F (0°C) in
freeze cycle, inlet water valve energized starting
when percentage of freeze cycle termination
temperature and freeze cycle time integrated value
has been achieved.
DO NOT ADJUST
10 to 100%
(00=100)
(1% increments)
10
61
Hard Water Control Water Supply Time
Time inlet water valve is energized after integrated
value (CB Setting 60) conditions are met.
Before using this setting, follow the instructions to
improve ice clarity; see "III.H.2. Ice Clarity."
0 to 90 sec.
(1 sec. increments)
0
Water Tank
Ice Control
70
71
72
74
If control board thermistor temperature is above
the water tank ice control lower temperature setting
(CBSetting 74) and equal to or less than the
water tank ice control upper temperature setting
(CB Setting 70) when freeze cycle termination
temperature (CB Setting 2) is met, the hot gas valve
energizes/de-energizes/energizes for the times set
by the hot gas valve energized/de-energized times
(CB Settings 71 and 72) to reduce bonding of the
water tank to the evaporator.
See Ranges Below See
Defaults
Below
Water Tank
Ice Control
& Ice Bridge
Control
70
Water Tank Ice Control Upper Temperature
See CB Setting 70, 71, 72, 74 description above.
Ice Bridge Control Temperature
See CB Setting 73 description below.
10 to 60°C
(1°C increments)
44
Water Tank
Ice Control
71
Water Tank Ice Control Hot Gas Valve Energized
Time
See CB Setting 70, 71, 72, 74 description above.
0 to 20 sec.
(1 sec. increments)
5
72
Water Tank Ice Control Hot Gas Valve De-Energized
Time
See CB Setting 70, 71, 72, 74 description above.
10 to 60 sec.
(1 sec. increments)
25
Ice Bridge
Control
73
Ice Bridge Control Hot Gas Valve De-Energized Time
Time hot gas valve is de-energized after 20 sec. in
harvest cycle if control board thermistor temperature
is above the ice bridge control temperature
(CBSetting 70) when freeze cycle termination
temperature (CB Setting 2) is met.
0 to 30 sec.
(1 sec. increments)
0