![](http://pdfasset.owneriq.net/2/0f/20f9fca7-cf95-4686-9609-b89cb7c92c56/20f9fca7-cf95-4686-9609-b89cb7c92c56-bg14.png)
20
PageCreated:05‐04‐2010
Revised:N/A
TechnicalManual(07610‐003‐78‐18)
INSTALLATIONINSTRUCTIONS(CONTINUED)
DETERGENT INJECTION POINT.
ANOTHER BULKHEAD PLUG
IS PROVIDED ON THE LEFT SIDE
OF THE UNIT
1-1/2" NPTF DRAIN CONNECTION
ADJUSTABLE BULLET FEET
BULKHEAD OPENING FOR
CONDUCTIVITY PROBE
CHEMICAL TUBE
INSERTION POINT
875"
INLET WATER FITTING
1/2" NPTF
MAIN ELECTRICAL
CONNECTION OPENING
1.375"
BOOSTER HEATER
ELECTRICAL CONNECTION
OPENING
1.375"
SHOWN FROM REAR OF LEFT TO RIGHT UNIT.
RIGHT TO LEFT UNIT IS MIRRORED