KitchenAid W10268948C Ventilation Hood User Manual


 
10
6. Attach terminal box to the wall and securely tighten screws.
7. Use UL listed wire connectors and connect black wires (B)
together.
8. Use UL listed wire connectors and connect white wires (D)
together.
9. Connect green (or bare) ground wire from home power supply
to the unused green ground screw (E) in the terminal box and
tighten ground screw.
10. Push excess home power supply cable back through the
strain relief and tighten strain relief screws. Use caulking to
seal openings.
11. Install terminal box cover and tighten screws.
12. Check all light bulbs to make sure they are secure in their
sockets.
13. Reconnect power.
Install Chimney Covers
For Vented Installations
1. Install damper on top of the exhaust opening. Check that the
damper opens freely.
2. Connect the vent system and seal all connections with
clamps.
For Non-vented (recirculating) Installations
1. Insert the charcoal filter into the opening behind the grease
filters and lock into place. See “Range Hood Care” section.
Install Upper Chimney Cover
1. Slightly spread the sides of the cover apart and hook them
behind the chimney mounting brackets.
2. Attach the cover to the brackets with 4 mounting screws.
3. Securely tighten screws.
Install Lower Chimney Cover
1. Slightly spread the sides of the cover apart and hook them
behind the upper chimney and the wall.
2. Attach the cover to the hood with 2 mounting screws.
3. Securely tighten screws.
A.Home power supply cable
B.Black wires
C.UL listed wire connectors
D.White wires
E.Green (or bare) ground wire from home power
supply connected to green ground screw
F. Range hood power supply cable
G.Range hood power supply cable connected to
green ground screw
A
B
C
D
E
F
G
WARNING
Fire Hazard
Electrically ground the blower.
Use copper wire.
Connect ground wire to green ground screw in
terminal box.
Failure to do so can result in death, fire, or
electrical shock.
A.4 mounting screws
A
A