Section 2 Installation Instructions
Part Number 80-1620-3 2-21
Installation Check List
F Is the Ice Machine level?
F Has all of the internal packing been
removed?
F Have all of the electrical and water
connections been made?
F Has the supply voltage been tested and
checked against the rating on the nameplate?
F Is there proper clearance around the ice
machine for air circulation?
F Has the ice machine been installed where
ambient temperatures will remain in the
range of 35° - 110°F (1.6° - 43.3°C)?
F Has the ice machine been installed where the
incoming water temperature will remain in the
range of 35° - 90°F (1.6° - 32.2°C)?
F Is there a separate drain for the water-cooled
condenser?
F Is there a separate drain for the bin?
F Are the ice machine and bin drains vented?
F Are all electrical leads free from contact with
refrigeration lines and moving equipment?
F Has the owner/operator been instructed
regarding maintenance and the use of
Manitowoc Cleaner and Sanitizer?
F Has the owner/operator completed the
warranty registration card?
F Has the ice machine and bin been sanitized?
F Is the toggle switch set to ice? (The toggle
switch is located directly behind the front
panel).
F Is the ice thickness control set correctly?
(Refer to Operational Checks to check/set
the correct ice bridge thickness).
Additional Checks for Remote Models
F Has the receiver service valve been
opened?
F Does the remote condenser fan operate
properly after start-up?
F Has the remote condenser been located
where ambient temperatures will remain in
the range of -20° - 120°F ( -29 - 49°C).
F Is the line set routed properly?
F Are both refrigeration lines to remote
condenser run so they do not lay in water
and are properly insulated?