Multiquip STXD6i Food Saver User Manual


 
STXD6i RIDE-ON TROWEL • OPERATION MANUAL —REV. #0 (03/23/12) — PAGE 35
LONG TERM STORAGE
1. Remove the battery.
2. Drain fuel from fuel tank.
3. Clean exterior with a cloth soaked in clean oil.
4. Store unit covered with plastic sheet in a moisture and
dust-free location out of direct sunlight.
INSTALLING PANS ONTO FINISHER BLADES
These round discs, sometimes referred to as "pans", attach
to the spiders arms and allow early floating on wet concrete
and easy movement from wet to dry areas. They are also
very effective in embedding large aggregates and surface
hardeners.
Refer to Figure 29 when installing pans onto finisher blades.
Figure 29. Z-Clip Finisher Pan Installation
1. Lift trowel just enough to slide pan under blades. Lower
finisher onto pan with blades adjacent to Z-Clips.
2. Rotate blades into position under Z-Clips. Ensure that
the blades are rotated in the direction of travel when
the machine is in operation or use the engine to rotate
the blades into position.
CAUTION
NEVER store the ride-on trowel with fuel in the tank for
any extended period of time. Always clean up spilled
fuel immediately.
BLADE ASSEMBLY
Z-CLIP, PAN
TIE-DOWN, BLADE
KNOB, TIE-DOWN
Z-CLIP PANS
MAINTENANCE
3. Attach the blade tie-downs to the far side of the Z-Clip
brackets with tie-down knobs as shown in Figure 29.
4. Check to make certain that the blade edges are
secured under the Z-Clips and the tie-downs are
secured completely over the edges of the blade bar
before the machine is put back into operation.